Inception through to handover and closeout (RIBA Stage 6): epd are involved in all stages of the scheme, from initial concept through to construction, handover and closeout. This includes:
1 detailed landscape designs and management plans for all 4 units and the associated infrastructure. The production of softworks and soiling specifications.
2 site supervision and signoff of the landscape works at Practical Completion (PC).
3 aftercare inspections throughout a 24 months defect period.
4 signoff at the end of the defect period.
5 production of all As Built information to be handed over to the client to form part of the health and safety file at the end of the contract.