G Park Northampton

G Park Northampton

Project Overview

epd were commissioned to undertake the landscape design for four warehouse industrial distribution buildings and associated infrastructure including the access road in Northampton

Collaboration and Multidisciplinary:

 epd worked closely with the client and all consultants as part of a large multidisciplinary team. This collaboration ensured that all aspects of the project were seamlessly integrated.
 
Project Phases
Inception through to handover and closeout (RIBA Stage 6): epd are involved in all stages of the scheme, from initial concept through to construction, handover and closeout. This includes:

1   detailed landscape designs and management plans for all 4 units and the associated infrastructure. The production of softworks and soiling specifications.
2  site supervision and signoff of the landscape works at Practical Completion (PC).
3  aftercare inspections throughout a 24 months defect period.
4  signoff at the end of the defect period.
5  production of all As Built information to be handed over to the client to form part of the health and safety file at the end of the contract.

Unit 1 

Site plan of G Park Northampton showing layout and landscaping details.

Unit 2

G Park Northampton landscape design plan with detailed layout and planting zones.

Unit 3

G Park Northampton landscape design and layout plan.

Unit 4

auto trader house soft landscape plan